Models and evaluation¶
Architecture suite¶
The public benchmark evaluates 13 architectures: five STGNNs and eight non-graph baselines. They cover distinct spatial-processing roles rather than a single graph-versus-non-graph split.
| Spatial-processing category | Architectures |
|---|---|
| Purely local temporal | DLinear, TCN, N-BEATS, PatchTST |
| Spatial identity | STID |
| Cross-variate implicit | LSTM, iTransformer, DSformer |
| Learned diffusion graph | AGCRN, Graph WaveNet |
| Learned spatial attention | STAEformer |
| Learned dynamics and graph | D2STGNN |
| Diagnostic control | Oracle GCN |
AGCRN, Graph WaveNet, STAEformer and D2STGNN are graph-based STGNNs. Oracle GCN is the fifth STGNN and is treated as a diagnostic control because it receives the ground-truth ring adjacency. It is not included as an ordinary competitor in model rankings.
Forecasting protocol¶
The standard public training entry point uses 48 historical steps and a 12-step direct prediction horizon. Autoregressive evaluation chains model predictions beyond that direct horizon to measure how long the forecast remains useful. Model-specific hyperparameters and the shared optimisation protocol are defined by the public entry point and documented under Configuration.
Valid Prediction Time¶
Valid Prediction Time (VPT) is computed separately for each held-out initial condition. Let \(\sigma_{\mathrm{IC}}\) be one scalar standard deviation over the complete forecast-target interval \(\mathbf{x}_{48:10000}\): all 9,952 forecast steps and all \(2N\) variables. At forecast step \(t\),
VPT is the zero-based index of the first step where \(\operatorname{NRMSE}(t)>1.0\). If no crossing occurs, VPT is the full 9,952-step forecast length. Higher VPT means that predictions remain valid for more rollout steps. The implementation also reports per-trajectory and aggregated rollout quantities.
Valid rollout and robustness¶
A model–system-instance pair is treated as valid when its mean normalised H=12 test-window MSE across training seeds 42, 43 and 44 is below 0.95. Pairs that fail this screen are not used in VPT comparisons for that system instance.
Robustness reports the fraction of evaluated system instances on which a model produces a valid rollout. It must be reported alongside VPT so that accuracy on successful runs is not separated from the frequency of success.
Conditional accuracy¶
For a matched model comparison, conditional accuracy evaluates VPT only on system instances for which both models have valid rollouts. This provides a paired comparison on a common support. It does not replace robustness: a model may have favourable conditional VPT while producing fewer valid rollouts.
Multi-seed aggregation¶
The submitted public result table contains one row per (model, K, ρ, N) key, aggregating three seeds with mean, standard deviation and count fields. Regime comparisons should preserve the system instance as the controlled unit and retain valid-rollout status rather than averaging indiscriminately across failed and valid runs.
Additional metrics¶
The public metrics module supports:
- MSE and MAE;
- symmetric mean absolute percentage error (sMAPE);
- NRMSE and per-horizon NRMSE;
- cumulative maximum error for autoregressive rollouts;
- adjacency precision, recall, F1 and AUC where learned adjacency is available.
See Evaluation and results for the analysis command and the tracked public aggregate.